Gurgaon properties Buying a Residential property for Renting

Gurgaon Real estate market is a high growth market. The prices rising over 160% between 2019 and 2024. The market is fuelled by corporate presence, rapid infrastructure development.

As the prices have grown and buying a land for Residential purpose is difficult, and with the presence of top builders in Flats segments, people are moving towards high end premium flats and those who are not able to afford these high prices look for Builder floors with timely construction and modern facilities.

As the land availability remains less and prices are high, many owners plan to buy a land and construct it for the purpose of Renting and the sectors where commercial offices, metro and other facilities are nearer is always on lookout. One of the old and premium area which board all the facilities is Sushant Lok I, sector 43.

The prices of land per square yard in Sushant Lok I ranges from 200000 to 400000. So, buying a land for Residential purpose and using it for Renting a 300 sq. yard plot cost nearly 8 to 12 crores. depending on the area and location in the sector and blocks. As this involves a huge investment, only a medium size builder and investor can enter this market . Also, he has to spend @ 60 lacs amount for construction of each floor and this project lands up to total investment of 12 crore to 15 crores. This project gives a constructed area of 8 Bed room set with a parking on ground floor. So, the Total Rental @ 50 per Set gives a return of 100 K per floor. The detail approximate working is enclosed for Investors referrals.

Project Cost in Sushant Lok I , Sector 43 , Gurgaon
Area 300 sq yard/2700 sq ft 
Built up area6400 to 7000FAR at 2.4
 1500 to 1800Sq. ft per floor
Permissible FAR1.6 to 2.4Depending on location, width and purchased FAR
Total built up5000 to 7000 Sq ftAcross 4 floors
Ground coverage60% to 70% 
Structure4 floors plus stilt 
  
Land cost300000 to 400000Per sq yd
 22437 to 44875Per sq ft
Average Cost          12,00,00,000.00Approx at Top
Construction CostAverage
Standard at 2150 
Stilt cost for 1800 sq ft                38,70,000.00 
Floor cost for 1800 sq ft                38,70,000.00 
Finishing Cost at 600 
Finishing Cost                10,80,000.00 
Furnishing Cost                  5,00,000.00 
Total Cost                54,50,000.00 
Ground floor Stilt                38,70,000.00 
4 Floor Cost            2,18,00,000.00 
Total Construction Cost            2,56,70,000.00 
Total Land Cost plus construction Slit +4 floor          14,56,70,000.00 
Govt Expenses                10,00,000.00 
Total Cost          14,66,70,000.00 
Rental value 
4 One-bedroom aptt                  2,00,000.00 
4 Floor Rent                  8,00,000.00 
Total Rental for a year                96,00,000.00 
Return on Investment7% 
Capital appreciation in year (Min)20% 

However, as per recent HUDA guidelines, Builders can construct Stilt plus 3 floors and final decision of court has to come on 17 th April, so entire costing for Rental purpose will be decided then.